A step ahead of the weather
The forecast is read against every lift and pour on the program, days before they happen.
Setout reads the forecast against your program, drafts each claim for you to check, puts every drawing on every crew phone and files every email on its job. All standard, and built around you when you need more.
From the gate at 6:52 am to the money in the bank, every module read and wrote the same job, and a person approved every step that left the building.
Site sign-on
14 on site
The crew signed on
Mon 6:52 am
Photos

Level 2 frames done
Mon 1:46 pm
Site diary
Signed by the supervisor
Mon 3:40 pm
Drawings
A-201 Rev D issued
Tue 6:40 am
Program
Lift moved to Friday
Tue 7:31 am
Delay notice
+1 day
EOT-KS-02 sent
Tue 8:14 am
ITPs
HP-06 released
Wed 9:40 am
Claims
A$231,600
Claim 8 sent
Mon 23 Nov
Xero
Paid
A$242,022 in
Wed 16 Dec
People and safetyPlan and runMoneyQualityConnect
NORTHBANK
SearchCtrl K
Today
Queues
Needs a reply
Waiting on others
Invoices to approve
Jobs
Kemp St townhouses6 71 2 3 4 5 6 7 8 9 0 1%
Lambton Rd fit-out68%
Parry St warehouse31%
Modules
Program
Site diary
Drawings
Progress claims
Budgets
ITPs
SWMS
PMProject managerNorthbank Builders
TodaySite phone
Good morning · Mon 16 Nov, 6:52 am
Kemp St finishes its level 2 frames today. The roof trusses go up by crane on Thursday.
Newcastle this week
Mon25°Tue27°Wed24°Thu21°Fri23°
The Bureau's forecast, read at 6:00 am
Kemp St townhousesBellwood Living · Frame, level 2 of 2
TodayLevel 2 wall frames, last panelsThursdayCrane lift, roof trusses, 7:00 am
Signed on at Kemp Stby location
6:52 amBayside CarpentryTickets checked, SWMS 019 signed6
6:47 amRidgeline RoofingEdge protection, SWMS 014 signed4
6:41 amNorthbank BuildersThe supervisor and labourers4
Every ticket checked once, when each person first signed on.
Site diary / Kemp St townhouses / 16 NovSite phone
Site diary, Mon 16 NovKemp St townhouses · Frame, level 2 of 2
DraftThe supervisor signs by 5:00 pmWeatherFrom the forecast
Dry, 17° to 25°Wind NE 14 km/h, no rain
Pre-filled from the Bureau's 6:00 am forecast
Photos5 6 today





On siteFrom sign-on
Bayside CarpentryFrames, level 26
Northbank BuildersThe supervisor and labourers4
Ridgeline RoofingRoof edge protection4
DeliveriesFrom the bookings
Roof trusses, 22 setsBayside Timber, 11:30 am, docket D-5512Docket
Work todayFrom the program
204 Level 2 wall framesBayside Carpentry, the last panels on grid DToday
301 Roof edge protectionRidgeline RoofingStarted
Waiting for the supervisor to check and sign it on site.
Program / Kemp St townhouses / Delay noticeSite phone
Program
Practical completionMon 12 Apr 2027forecast, on the contract dateTue 13 Apr 2027one day later, rain on Thu 19 Nov
Done61 2 3 4%was 61% this morning64%on program
Next on siteRain this weekCrane lift, Thuroof trusses, 7:00 amThu 19 Nov80%, 10 to 20 mm
Thursday's 80% rain is over the crane lift. Friday is 20%, and Hireline has the crane free. Moving the lift moves roof framing and sheeting a day with it.Moved by the PM at 7:31 am. Hireline, Bayside Carpentry and the supervisor are told.
Keep ThursdayMove to FridayWork packageWed 11Thu 12Fri 13Mon 16Tue 17Wed 18Thu 19Fri 20Mon 23Tue 24Wed 25Thu 26Fri 27
The Bureau's forecastread Tue 17 Nov, 6:00 am
5%10%5%5%5%20%80%4 5 6 7 80%20%10%5%30%20%10%
Frame
204Level 2 wall framesBayside CarpentryTodayDone 16 Nov
100%
HP-06Engineer's inspectionLevel 2 framesWed 18 Nov
Hold point, 9:00 am
205Crane lift, roof trussesHireline, Bayside CarpentryThu 19 NovFri 20 Nov
Moved from Thursday
206Roof framing and bracingBayside CarpentryWed 25 NovThu 26 Nov
Services
401Rough-in, level 1Coastline PlumbingMon 23 Nov
Rev D, 2 changes
Roof
301Roof edge protectionRidgeline RoofingTue 17 Nov
302Roof sheetingRidgeline RoofingThu 26 NovFri 27 Nov
Claim milestones
C8Frame stage, claim 8Bellwood LivingMon 23 Nov
Claim 8
Delay noticePDFSend to Bellwood LivingSent 8:14 am
Delay notice and claim for more timeDraft, due Tue 24 Nov
ReferenceEOT-KS-02ToBellwood LivingDueTue 24 Nov, 5:00 pm
A$0 1 2 3 4,000 at stake. Kemp St's liquidated damages for one day, if the notice goes in late.
The claim
Days lost1 working day, Thu 19 Nov, rain
Work held up205 Crane lift, on the critical path
Practical completionMon 12 Apr Tue 13 Apr 2027
Extension claimed1 day
Built from
The Bureau's forecastTue 6:00 am205 moved by the PM7:31 amThe signed diaryMon 16 Nov
The letter
We give notice that rain forecast for Thursday 19 November, 10 to 20 mm, will delay the crane lift of the roof trusses, which is on the critical path. We claim one working day.
Drawings / Kemp St townhouses / A-201Site phone
A-201Ground floor plan
Kemp St townhousesRev D
Rev D of A-201 is inFrom Fenwick Lane Architects, 6:12 am
A-201 Ground floor planRev D
Laid over Rev C: 0 1 2 3 changes clouded
1Window W03 widened, 1200 to 1800
2Laundry door moved 450 along the wall
3Kitchen bench extended 600
On the program
401Rough-in, level 1Mon 23 Nov · changes 2 and 3 touch itCheckingFlagged
The crews
Bayside Carpentry, Coastline Plumbing and Sparkline Electrical: 18 phones work from A-201.
Issue Rev D to 18 phonesIssued 6:40 am, Rev C supersededITPs / ITP-KS-04 / HP-06Site phone
Frames and roofITP-KS-04 Rev A · Kemp St townhouses · Level 2 walls and the roof
HP-06 heldHP-06 released5 6 of 9 points closed1 2 of 3 hold points releasedHHold point: work stops until it is released
NoInspection and acceptanceMethodStatus
1Wall frames set out to gridA-101 Rev CSurveyClosed 9 Nov
2Studs, plates and lintelsAS 1684.2VisualClosed 11 Nov
3Bracing wallsS-301 Rev BVisualClosed 13 Nov
4Tie-downs to S-301S-301 Rev BVisualClosed 16 Nov
5Level 2 wall frames finishedThe signed diary, 16 NovRecordsClosed 16 Nov
6HHP-06 Engineer's inspectionTie-downs and bracing, before the trusses go onHold pointWaiting, 9:00 amReleased 9:40 am
Released by the engineer, Harwood Lee Engineers, from a link. It lets these go ahead:205 Crane lift, Fri 7:00 amclear to liftClaim 8, frame level 2can be claimedPoints 7 and 8open on site
7Roof trusses set and bracedTruss layout T-01VisualWaits on HP-06Can start
8Truss tie-downsS-302 Rev AVisualWaits on HP-06Can start
9HHP-07 Frame inspectionThe certifier, before liningHold pointWaits on 7 and 8
Progress claims / PC-KS-08Site phone
Progress claims
Paid to youA$2,104,187Certified, not yet paidA$368,350
ClaimJobPeriod
PC-KS-08Kemp St townhousesNov 2026
PC-PS-04Parry St warehouseNov 2026
PC-LR-06Lambton Rd fit-outNov 2026
PC-KS-07Kemp St townhousesOct 2026
PC-LR-05Lambton Rd fit-outOct 2026
PC-PS-03Parry St warehouseOct 2026
PC-KS-08PDF
Claim 8, Kemp St townhousesOverduePaid
Amount dueA$242,022.00CertifiedIn full, 7 DecDueMon 23 Nov Mon 30 Nov Mon 7 Dec Mon 14 Dec
From Xero, the bank feed, Wed 16 DecBellwood LivingA$242,022.00
Activity
Built from November's signed diaries, dockets and photosMon 23 Nov
Checked and sent by the PM4:12 pm
Their schedule: A$231,600.00 certified, in fullMon 7 Dec
Payment due, not paid by 5:00 pm 1 day lateMon 14 Dec
Chaser sent by the PM, drafted with the claim and their scheduleTue 7:12 am
Paid, A$242,022.00, matched from XeroWed 16 Dec
Progress claims / PC-KS-08Site phone
Claim 8, Kemp St townhousesDraft, ready to checkSent 4:12 pm
ReferencePC-KS-08ClientBellwood LivingPeriod1 to 23 Nov 2026
Frame stageDoneThis claim
Frame, level 1100%A$118,400.00
Frame, level 2HP-06 released100%A$96,200.00
Roof frame40%A$17,000.00
This claimA$231,600.00
Less retention, 5%−A$11,580.00
GSTA$22,002.00
Amount dueA$0 1 20 1 2 3 40 1 2,00 1 20 1 2.00
The NSW payment clockfrom the Security of Payment Act
ServedMon 23 Nov, when the PM sends itTheir schedule dueMon 7 Dec, 10 business daysPayment dueMon 14 Dec, 15 business days
Built from
Signed diaries0 10 1 2 3 4 5 6Dockets0 1 2 3 40 1Photos0 1 2 3 4 5 6 7 8 90 1 2 3 4Hold points0 1 2 3 4 5 6 released
Drafted from November's signed records. Nothing is sent until the PM checks it.
Open the sheetCheck and send
KSKemp St townhouses
Signed onMon 16 Nov · Bayside Carpentry
You're at Kemp StSigned on by location at 6:52 am
Checked onceon file
White cardGeneral construction induction
Working at heightsTicket on file, current
SWMS 019
Frames at height, level 2
On site nowFrom three companies14
AlbumKemp St townhouses

Last panel, grid D.Level 2 frames done.
1:46 pm · Level 2, Kemp St
File toToday's diary204 Level 2 frames
RetakeFile photo
KSKemp St townhouses
Site diaryMon 16 Nov · Kemp St townhouses
WeatherDry, 17° to 25°
On site14 people
Photos6 today
DeliveriesRoof trusses
204 Level 2 wall framesFrom the programFinished
Signed by the site supervisor
Sign and saveSigned and saved
A-201 Rev D is on your phone3 changes marked. Rev C is superseded.now
KSKemp St townhouses
DrawingsTue 17 Nov · Bayside Carpentry
A-201 Ground floor planRev D · 3 changes markedNew
A-201 Ground floor planRev CCurrentSuperseded
A-202 First floor planRev BCurrent
Crane lift moved to FridayRain on Thursday. The PM moved it to Fri 20 Nov, 7:00 am, and Hireline is booked.now
TodayTue 17 Nov · Roof edge protection
Thursday80% rain10 to 20 mmOn site12people
This weekfrom the program
Wed9:00 amHold point HP-06The engineer inspects the level 2 frames
Thu7:00 amCrane lift, roof trussesRain 80%, 10 to 20 mm
Fri7:00 amCrane lift, roof trussesHireline and Bayside Carpentry
NORTHBANKasks you to inspect and release a hold point at Kemp St townhouses.
Hold point HP-06
Level 2 wall frames: tie-downs and bracing
ITP-KS-04, point 6 · Wed 18 Nov, 9:00 am
Tie-downs as on S-301 Rev B
Bracing walls as drawn
6 photos from the supervisor, 9:12 am



Tie-downs and bracing as drawn. The trusses can go on.
Signed as the engineer, Harwood Lee Engineers
Release HP-06Released 9:40 am
NBNorthbank BuildersPM
WaitingOn others · Tue 15 Dec, 7:12 am
Sent
Claim PC-KS-08
Bellwood Living, claim 8
1 day lateA$242,022
The chaserSent 7:12 am
To Bellwood Living, accounts
Claim 8 for A$242,022.00 was due on Monday 14 December, as your schedule of 7 December certified. Could you confirm when it will be paid?
PC-KS-08.pdfSchedule.pdf
Selection SEL-09
Bellwood Living to choose kitchen colours
Due Fri 18 Dec
TodayCameraDiaryDrawings
TodayMoneyJobsInbox
Site sign-onMon 16 NovBayside Carpentry
You're at Kemp StSigned on by location at 6:52 am
White cardGeneral construction induction
Working at heightsTicket on file, current
Signed on at Kemp Stby location13 14 on site
6:52Bayside CarpentryTickets checked, SWMS 019 signed6
6:47Ridgeline RoofingEdge protection, SWMS 0144
6:41Northbank BuildersThe supervisor and labourers4

Last panel, grid D.Level 2 frames done.
1:46 pm · Level 2, Kemp St
Today's diary204File photo
Site diaryMon 16 NovDraft
Dry, 17° to 25°From the 6:00 am forecastNo rain
14 on siteFrom sign-on, three companies6, 4, 4





Site diaryMon 16 NovThe supervisor
WeatherDry, 17° to 25°
On site14 people
Photos6 today
204 Level 2 wall framesFrom the programFinished
Sign and saveSigned and saved
ProgramKemp StDone 61 62 63 64%
204 Level 2 wall framesBayside CarpentryTodayDone 16 Nov100%
A-201Ground floor planRev CRev D over C
0 1 2 3 changes cloudedCD
Rev Dto the crewsReadyIssued 6:40 am
18 phones have Rev D3 changes marked, Rev C superseded18 of 18
401 Rough-in, level 1Mon 23 Nov · changes 2 and 3 touch itCheckingFlagged
ProgramKemp StThis week
MonTueWedThuFri
Forecast5%5%20%80%4 5 6 7 80%20%
Crane lift
Roof framing
Moved to Friday by the PM, 7:31 am
Toldwhen the PM moved it7:31 am
Crane lift moved to FridayRain on Thursday. The PM moved it to Fri 20 Nov, 7:00 am.
HirelineBayside CarpentryThe supervisor
Delay noticeEOT-KS-02DraftSent 8:14 am
1 working dayThu 19 Nov, rain 10 to 20 mm, over the crane lift. Practical completion moves to Tue 13 Apr 2027.
A$0 1 2 3 4,000 at stake if it goes in late. Due Tue 24 Nov.
Check and sendSent to Bellwood Living
A linkfrom Northbank BuildersHP-06
Level 2 wall frames: tie-downs and bracingITP-KS-04, point 6 · Wed 18 Nov, 9:00 am
Tie-downs as on S-301 Rev B
Bracing walls as drawn
6 photos from the supervisor



Tie-downs and bracing as drawn. The trusses can go on.
Release HP-06Released 9:40 am
ITPsFrames and roof5 6 of 9 closed
HHP-06 Engineer's inspectionReleased from a link, 9:40 amHeldReleased
205 Crane lift, FriClaim 8, level 2Points 7 and 8
Claim 8PC-KS-08Frame stage
Frame, level 1100%A$118,400
Frame, level 2HP-06 released100%A$96,200
Roof frame40%A$17,000
Amount dueA$0 1 20 1 2 3 40 1 2,00 1 20 1 2.00
ServedMon 23 NovScheduleMon 7 DecPayment dueMon 14 Dec
Check and sendThe PMDraftSent 4:12 pm
Diaries0 10 1 2 3 4 5 6Dockets0 1 2 3 40 1Photos0 1 2 3 4 5 6 7 8 90 1 2 3 4Hold points0 1 2 3 4 5 6
Check and sendSent to Bellwood Living
Paymentfrom XeroMon 23 Nov Mon 30 Nov Mon 7 Dec Wed 16 Dec
Bellwood LivingThe bank feed, matched to PC-KS-08A$242,022.00
Due Mon 14 DecNot in by 5:00 pm1 day late
Chaser sent by the PMDrafted with the claim and their scheduleTue 7:12 am
Claim 8 paidClosed
/In the standard modules
No custom build needed for any of these. Each works from the same record your team already fills in, and nothing goes out until a person says so.
The forecast is read against every lift and pour on the program, days before they happen.
Each claim is drafted from the signed diaries, dockets and photos, with its due dates set by your state's payment rules.
Issue a revision and watch it reach each crew phone, with the old one marked superseded.
Mail lands on the job and record it's about, with the reply or the chaser drafted from what the job knows.
Crew sign on as they arrive, with their tickets checked once and the day's SWMS signed on their phone.
Ask in plain English for any record or report, and every line of the answer links to where it came from.
/Try it
Three made-up jobs and one week. Watch what Setout gets ready, and what it leaves for you.
Illustrative demo
What Setout did
Example only. In your Setout it works from your jobs, your records and your people's permissions.Want it in your brand? Show my system
/Everything in Setout
Fill a thing in once and everything it touches follows: the program, the budget, the claim and the crew's phones. This is all of it.
Your planner's file brought in from MS Project, Excel or P6 and kept right revision after revision, with the site's forecast beside the planner's dates and every moved date naming its cause.
The program, the three-week lookahead, the week board, the site plan and a list are tabs on one live program, saved for you or shared with the job.
Drag a package and what waits on it slides along, with where practical completion lands shown before you let go. A later date asks for its reason, and a move on the planner's program goes to the planner.
Each line carries what must be ready before it starts, with an owner and a countdown, and a released hold point clears its line the moment it's signed.
Each trade gets only its own dates by a link with no login, at most one message a day, and says yes or can't make it from its phone.
Published once a week with what changed and a reason for every slip, each trade's share of last week done as planned, and the site meeting run off the screen.
Who's in the job now, every change on every screen within seconds, the job's feed and what changed since you last looked. Activity, never anyone's location.
Talk or type a question on the desk or your phone. Every answer links to its records and says when they don't hold it, and anything it would change waits for a person.
A PDF from the planner or a photo of the shed whiteboard read into packages, for a person to check line by line.
A short note after each publish of what moved and why, every date linked to its record, for you to check and send.
The client or superintendent opens the week you published from a link with no login, with no money and no notes, and you see when they opened it.
Saturdays, a second crew or a new order tried on a copy of the forecast, with completion and the money against the damages side by side.
Today's starts and finishes answered with one tap on the phone, a package marked in three taps or fewer, and all of it working with no signal.
Each supervisor's companies, packages and areas on one board for the PM and the shed TV, with what hasn't started or answered first.
The site plan coloured by company for the day or the week, with a flag when a crew needs an area to itself or a lift passes over a walkway.
Metres, panels or cubic metres counted each day, so a slow crew shows before its finish slips and the next trade is warned in time.
People and plant on every package with totals for every day and shift, a flag when the crane is wanted twice, and night work first on the phone after dark.
Possessions, road occupancy licences and after-hours windows with their lead times, so no start waits on a booking nobody made.
Takt for repeated units with inspections as the gates, time and chainage for roads and rail, and an hour-by-hour plan for a possession.
On any phone, even offline, pre-filled from the program, yesterday's entry, the weather and who signed on. A docket photo or a voice note can start one; a person finishes and signs it.
Day works and plant dockets signed on the phone or by a link with no login, with the PDF to each side at once.
A signed job card from their own app or on paper can be the docket: photograph it, and a person checks what it says.
Each delivery booked on the agenda and photographed on arrival, with its docket number and quantity there for the invoice check.
Time lost to rain recorded with who stood down, the work it held up and the rain in site hours, ready for the delay notice.
A subbie's foreman adds their own count and note to the diary, and keeps a record of their company's days and stand-downs.
The current set on every crew phone. Each new revision is laid over the last with every change clouded, and the work it touches is flagged.
Upload the architect's model or plans, and every job shows the real building, with what's built, today's work and what's next lit up from the program.
Every crew phone counted in when a revision goes out, with names against anyone who hasn't got it or opened it.
A new model is laid against the last, with the parts that changed lit on the building and the work they touch flagged.
A link that always opens the current revision, with no login and no app; a code on every printed sheet that says whether it's still current; and search by any word on a sheet.
Linked to the activities and cost they hold up. An unanswered one flags what it blocks, with the chase drafted.
Raise an RFI on your phone with a photo and a pin on the drawing, even with no signal, and say what it holds up.
Architects and engineers answer from a link with no login, agree with your proposed answer in one tap, or attach a sketch, and the answer lands on the RFI.
Each RFI's due date comes from the answer period you type from the contract, and every row shows who has it now and for how long.
When a new drawing revision picks up an RFI, it's offered as the answer, and shop drawings drawn from the old revision are flagged for a person to check.
Sent for review in rounds, with every response and stamp kept together.
Every submittal's due date is worked back from when it's needed on site, less lead time and review time, so a short one shows early.
A trade sends its shop drawings from a link with no login. You check them first, the reviewer stamps them in their own words, and every round is kept.
Minutes whose actions carry over until someone closes them.
Each site meeting's agenda is drafted from open RFIs, shop drawings, defects, the next three weeks and last week's actions, for you to check and send.
Trades, consultants and clients confirm your minutes are a fair record, or send a correction, from a link with no login.
Job email, letters and notices on each job's register, filed with the records they belong to.
A letter is drafted from your template and the job's facts. You sign it, and it's numbered, sent and kept on the job's register.
Every letter shows when it was delivered, who in your team has seen it, and who confirmed receipt from its link.
Sorted by job, area and date, and attached to the records they back up.
Every photo goes straight to its job, area and record, even with no signal, and stays out of your camera roll.
Take this week's progress photos from the same spots with last week's as a guide, and send them as a numbered photo report.
Photos say whether they were taken on site. No coordinates are kept, so nobody can map where you've been.
Budget, orders and cost to date for every cost code, so an overrun shows while there's time to act.
An order over what's left, a delay on a time-based line or a signed docket shows on its cost code the day it happens, with the dollars and why.
Forecast margin by job and across jobs against what you tendered, with every dollar that moved it since the last cost report.
Each job's budget, orders, cost and forecast sealed at month end, with only what's changed to check, signed by its project manager.
Built from the budget and the signed records, with retention, the claim pack and each state's payment clock running.
Each one tracked against its deadline and chased the day it's late.
A subbie claims from a link with no login and no fee, with its lines and retention already there, and both sides see the same dates.
A claim line can wait on its ITP hold points, so nothing is claimed before it's signed off.
A trade claims to every builder from one list, free, with its lines, retention and papers already there and each state's dates, whether or not the builder is on Setout.
From a trade's own records only: how long each builder takes to schedule and pay, what's part paid and the retention it holds. Never shared, never a score.
Each notice period you type in from the contract, and every payment deadline under NSW, Victorian, Queensland, WA and SA rules, checked the day something happens, with the delay notice drafted from its evidence.
Every claim, schedule and notice keeps how it went, to which address, when it landed and the file's fingerprint, on one page you can print.
Retention held by company and job, with its release dates and notices, and the trust duties that may apply in your state.
One export with the claim, the schedule, how each was served and the proof behind them, with every window's dates.
A delay flagged from site the day it starts, with its photo, the work it stopped and six dates, in one register with your own delays beside the client's.
The program as it stood the day before a delay, statused with what the site recorded, the as-built with who recorded every date, and the update report drafted from each revision.
Every invoice matched to its order, its docket and the approved changes before anyone approves it.
A changed account or a doubtful sender stops the invoice until someone rings a number already on file and records who confirmed it.
Invoices that pass every check approved together, with the total on the button and a record for each. Anything flagged or signed still opens on its own.
Approve the part of an invoice that checks out and query the rest on one record, with the credit note chased and tied back.
Thirteen weeks ahead, from what's claimed, what's owed and what the program says is coming.
Signed by the crew on their phones. Each revision asks again, and updates are drafted for approval when the work changes.
Twelve starters for common high risk work, made your own by choosing each control, and reviewed on site by a named person before anyone signs.
Each SWMS read against one list, with vague controls and work it doesn't cover marked, and a dated name on the answer. Work with no SWMS is flagged from the program.
One phone passed round after a briefing, or a paper sheet photographed, with who briefed them and in what language on the record, even with no signal.
A SWMS's controls become a short check on site, one tap each, and a failed one goes to the trade and asks for a review.
A code on the crib room wall opens the job's current SWMS and safety plans with no login, so anyone on site can read them.
A tap at the gate, or automatic on arrival in the app for anyone who switches it on, with tickets checked once.
Done once per builder and checked before work starts, with a supervisor-run mode on site.
A visitor signs on with no account, no app and no code, or a host adds them, and they stay on the evacuation list until they go.
Leave without signing off and your time is marked as an estimate, for you to confirm or fix with one tap next morning.
A lapsed ticket or induction goes to the supervisor at the gate, who decides and records why, and the person stays on the evacuation list either way.
Everyone signed on, visitors included, on supervisors' and foremen's phones by company, ticked off at the assembly point with no signal needed, and a practice goes on the record.
Every time kept about you, across every builder, on your own phone, and a subbie's office gets its crew's days and hours free, for pay and RDOs.
Only arrival and departure times are kept, never a location, with the notice written from the job's own facts and automatic off until you switch it on.
The sign for the gate, with your company's name, phone, site office and licence, printed from the job.
Reported from site with the notifiable check, then followed through to close.
On every job and every plan, even before sign-in and with no signal: 000, the address to read out, your state's regulator and its number, and what not to touch.
A person's name and injury are read only by a short named list, every read logged, and never reach a lock screen, an email, a link or the morning brief.
A code on the shed takes a photo and a word with no login, with a name or without one, and whoever raised it hears what happened to it.
Raised, approved and closed on site.
A row before a permit ends, and one that ends still open goes up the line until a person answers. It never extends itself, and any gap shows on the record.
One page on the phone with the job's plan, SWMS, permits, checks and registers, even with no signal, a log of what was shown, and each notice kept with its date.
Every company you deal with, once: its ABN checked on the register, its trades, contacts, jobs and paperwork, with a rename that keeps its history and a merge you can undo.
A subbie's licences, insurances and SWMS, and each worker's own cards, held once and shared by consent with each builder in two taps, with expiry warnings.
Three clicks and a link: no login, no app, no fee, and about five minutes on a phone to send what the site needs.
Who's next in and what they're missing, each card marked seen with one tap, and a QR code that adds anyone who turns up.
A rename keeps its history, a merge can be undone, and a signed record keeps the name it was signed with.
A trade's ABN and licences are checked on the public registers each month and before each claim, with the date on every copy and no verdict.
Every trade you invite gets its own free account: each job it's on for every builder, with its papers, crew, notices and claims in one place on its phone.
Post site hours, deliveries, crane bookings, inspections, safety alerts and stand-downs to every trade or one company, pin them or let them expire, and see who has seen each one.
Each trade's board shows what moved for its own work: its dates, a drawing issued or superseded, an RFI answered and a hold point released before it starts.
Notices that matter ask for seen or read and understood, in the app, from a link with no login or at the gate, with one gentle second ask and never more than one message a day.
A trade shares its profile with each builder by name and stops with one tap. The builder sees it only while it's shared, and keeps the copies it relied on.
A trade's papers go to a builder not on Setout as a link that stays current, ends on a date and shows when it was opened.
Signed SWMS sheets, dockets, payment schedules and the days its crew worked come back to the trade's own account from every builder.
Hold and witness points signed in the field and released by the inspector from a link, with later steps locked until they are. Each certificate filed on its step.
The activities that usually need an ITP are drafted from their templates, split by pour, level or lot, with each hold point dated from the program for a person to check.
One list of every hold point, witness point and test on every job, with who's booked, who hasn't answered and what's late, and a lab drops its results in from a link with no login.
Every signed form for a job and period in one PDF, with an index and each record's fingerprint, for an audit or a certifier.
ITP records, releases, tests and non-conformances by stage or lot, as a PDF or a read-only link, with no money in it and what's missing on page one.
Every signed record kept as a PDF with its own fingerprint, checked each time it's opened.
By area, with photos, assigned, fixed and signed off, and back-charged where someone else caused them.
Raised from a failed check, with the hold kept shut until the fix is agreed and closed.
The notice, the answer, the docket behind every dollar and the line on their next payment schedule, on one record a person signs.
Each part of the job counts to its own date, with a final walk and a signed list, and a client can report a defect from a link for a person to accept.
Every defect, non-conformance and point a trade holds on a job, on one page with no login and no fee: done with a photo, not ours, or propose a fix.
Proper forms and inspections on any phone, even offline, pre-filled from the job, numbered and signed by a person. A photo or a note can start one, and a scaffolder or engineer can fill one in from a link with no login.
Paste your list or upload your spreadsheet and the form is on every phone in minutes, with your numbering and who signs. Or we set them up with you.
Weekly walks, 30-day scaffold checks, checks before a pour and after rain come up when they fall due, on your working days, and late ones look late.
Every failed item is fixed on the spot or sent to the trade with its photo, or raised as a defect or non-conformance, and stays open until someone closes it.
A code on the tag shows who last checked it and when it falls due, with no login and no app.
Ask in plain English across every job. Every line of the answer links to its source, and anything it drafts waits for a person.
Your own data, open through an MCP server to the assistants you already use, to read and draft only.
Mail and attachments filed on the job, invoices and claims picked out, and replies suggested. Shared inboxes too.
Bills, invoices and payments kept in step with your accounts.
Programs in, and back out again.
Updates from site turned into records on the job.
What's about to slip, which cost line is burning, which deadline is due and whose ticket expires, in days and dollars, with one action each.
One short email or phone notice at the time you choose, only on your working days, and only when something is new.
When nothing is wrong Setout sends nothing, and Today says what it checked and when.
Every module writes to the same job. A wet day moves the dates, and an unanswered RFI flags the work it blocks.
Setout drafts diaries, notices, claims and SWMS updates. Nothing is sent, approved, paid or signed until a person says so.
Every number, date and name in a draft is marked with the record it came from, and checked against it before you see it.
The site app keeps working without signal and sends every form exactly once when it's back. On iPhone too.
A capture the job can no longer take waits for a person in the office, and is never lost.
Each job opens on what needs you: the next deadline and its money, the site card, documents to hand and what changed since you last looked.
Pause a job and pick it up again, record practical completion, and close it with a checklist of what's still open. A closed job stays whole and read-only.
A name, a trade, a level or a word finds the record, not only its number. Ctrl K on the desk.
Each job's areas, picked in every form, so a defect or a test lands where it belongs.
Everyone sees the jobs they're on, a subbie sees only its own part, and money reaches only the people you allow.
A subbie working for three builders sees all three on one Today, and switches between them without signing out.
Setout's support team sees your records only while you've let them in, and you can see every page they open.
Name who covers and for how long. You both see what's waiting, both names go on the record, and a deadline moves up the line before it's missed.
One click on the desk, two taps on the phone, and you're back where you were.
Your program, budget and registers uploaded, and your real job set up before the day is out.
Your logo and colours, taken from your website, on every screen, form and signed PDF.
A clearly marked sample job in your trade, gone in one tap, and every empty screen shows a sample row and the one action that fills it.
Three or four steps on Today, each done right there, that go away once your first job is running.
Your planner, estimator or architect drops the file in from a link with no login, and you check it before anything goes on the job.
Type the job's facts once. It shows what each upload unlocks, never a page of zeros.
Export from your current system before you cancel, and we do the rest. Jobs, documents, drawings, photos and registers come across with their old numbers, you check it all first, and you can run both for a month.
/Built around you
Most companies start with the standard modules. When you need more, we set it up or build it on the same engine, and you deal with the people doing it. Talk to Luca about Tailored or Custom.
We already build and run construction software in production: HoldPoint QA and CostCode.
In your brand, priced per module with a live total, and more added as you grow.
Set up with you: your sign-off chain, your templates, your words.
Scoped with you first, then built on the same engine, so it keeps every standard feature. It can run on a database of its own.
/Start here
Type it in and your system appears in your own name, logo and colours. Five short questions set it up for how you run jobs, with every price and a live total. Save it and come back to it, or ask Luca for a walkthrough.
Luca shows you Setout on jobs like yours, and sets up Tailored and Custom with you. Tell us a little about the business to book a time.
IT or risk team need detail? Ask for the security pack.
Luca will reply by to set a time that suits you. If you need us before then, email hello@setoutsystems.com and quote your reference.